Filter Projects:
Reset Filters
248,828 sf Industrial Development in Burlington
Problem: The Burlington area is getting a brand new industrial development, which includes two divisible industrial...
Etobicoke Waste Transfer Station
The Etobicoke Waste Transfer Station project was a design-build where the engineer specified a different Air...
General Mills, 1875 Buckhorn Gate – SpringAir Kitchen Exhaust System
Smith + Andersen reached out for a full Spring Air kitchen exhaust system with a hood,...
Ventura Foods
The incumbent service contractor, A/C Air Systems, at Ventura Foods in Etobicoke called in O’Dell Associates...
KML Windows
KML Windows in Strathroy needed an exhaust system for a chemical dip tank. This tank was...
Sessions Craft Canning
The manufacturing facility has a hot water washing process that generates a lot of steam that...
CTC Warehouse
The new CTC warehouse has a specific hazardous material storage area (Boom Room!) that required properly...